Leaving Salesforce4 min read

Leaving Salesforce, in the order we would do it

By ·Founder, K3 LabsPublished Updated

We moved ARC Gaming & Technologies off Salesforce in six months, December 2025 to May 2026. The new CRM was the easy part. What took the time was keeping two live systems in agreement while people kept using both.

If you're weighing a move, you probably want three answers: how long it really takes, what breaks, and what might make you stay. For us it was six months, the sync between old and new, and a field app that nearly kept us on Salesforce. All three are below.

ARC left because their sales team couldn't use Salesforce to sell more, and a second instance for a new geography was more than they could afford. We think they used a small fraction of the licences they paid for. That's our estimate, not a measurement. The full story is in the six-month account.

If we started again tomorrow, this is the order we'd follow.

  1. Find your deadline in your order form's renewal and notice terms. List prices move too: up 6% on average in August 2025.[1]
  2. Export your data and files before you cancel anything.[2]
  3. Build the data first, the CRM second.
  4. Run both systems in parallel, and expect the sync to break.[3]
  5. Cancel last, once the new system carries the work.

We can speak from this move to steps three and four, so that's what the rest of this page covers.

Data first, then the CRM

We built the Single Data Backbone and automated the reporting on it before we touched the CRM. We think that order is why the rest held together.

We also didn't copy Salesforce's shape. At ARC the CRM was an operational tool, not a sales tool, so sales operations got its own place instead of living inside the CRM.

The sync code was easy. Knowing what the data meant was not.

Writing a two-way sync is the easy part now. A code model will give you a working template in an afternoon. What it can't give you is what your Salesforce data means to the people who type it.

Take opportunity stages. In theory a stage name tells you where a deal is. ARC had nine opportunity stages and no naming standard, so each team read the same stage differently. We could guess the meaning from the label, and the guess was often wrong for whoever owned that record. Before we could map anything, we had to learn how each team really used each field. Data-integration researchers have said this for decades: a mapping needs business knowledge of what the data means.[4]

The engineering had its own surprises. Our first workflow engine kept timing out on long sync jobs because of Vercel's function limits. We moved those jobs to Prefect and hand-written schedulers, so a job either finishes or fails loudly and retries.

The harder problem was people. With both systems live, some fields stopped having a single source of truth. One team changed a value in Salesforce while another changed it in the new CRM, and both thought they were right. Copies that are edited separately drift apart; that's a known hard problem in computing, not a bug in your code.[5] No code fixes the human half of it. We had to tell every team, field by field, which system owned it, and keep telling them until Salesforce was gone.

What held it together was a judgement layer that works out what a change means before it writes it to the other side. The fixes never stopped. They ran the whole six months, so budget for that.

If you plan a parallel run, write down the owner of every shared field before day one.

The field app nearly kept us on Salesforce

The one thing that nearly kept us there was the field iOS app. Its licence was expensive, and we almost stayed for it anyway.

We built Helix, a real-time, offline-first app, to replace the field apps. Operations hasn't adopted it yet, so we can't tell you it does the job. That's the one place Salesforce nearly won.

Who should not move

Don't move if data isn't your problem, or if you don't need to manage workflows and automation.

Our view is that Salesforce is too expensive, too big and too complicated for a small team. We also think you're better off with something built for your team on a single data backbone than with spreadsheets run through LLMs and copilots. There's a side-by-side with Salesforce plus QuickBooks, and ARC's story shows what we built for them.

If you're deciding, talk through your exit with us. It's 30 minutes, and it's a working session, not a pitch.

Our own research

What we saw at one customer, and what we'd test next.

  • Observation. ARC had nine opportunity stages and no standard for naming them, and different teams read the same stage differently. We didn't count how many of the nine were read differently.
  • Observation. During the parallel run, people on different teams edited the same field in different systems. The fix was organisational: naming which system owned each shared field.
  • Hypothesis. Naming an owning system for every shared field before a parallel run starts cuts conflicting edits. We did it partway through, not before, so we can't say by how much. To test it we'd count conflicting edits per week on the next move, with owners named on day one.

References

  1. 1.Salesforce (17 June 2025). Updated product packaging and pricing offer new AI capabilities and more ways to scale AI throughout every organization. Salesforce newsroom. https://www.salesforce.com/news/stories/pricing-update-2025/
  2. 2.Salesforce Trailhead. Export data (unit in the Data Management module). Accessed 20 November 2026. https://trailhead.salesforce.com/content/learn/modules/lex_implementation_data_management/lex_implementation_data_export
  3. 3.Bisbal, J., Lawless, D., Richardson, R., O'Sullivan, D., Wu, B., Grimson, J., & Wade, V. (1997). A survey of research into legacy system migration. Technical report TCD-CS-1997-01, Trinity College Dublin. https://publications.scss.tcd.ie/tech-reports/reports.97/TCD-CS-1997-01.pdf
  4. 4.Halevy, A., Rajaraman, A., & Ordille, J. (2006). Data integration: the teenage years. Proceedings of the 32nd International Conference on Very Large Data Bases (VLDB '06), Seoul, Korea. https://www.vldb.org/conf/2006/p9-halevy.pdf
  5. 5.Saito, Y., & Shapiro, M. (2005). Optimistic replication. ACM Computing Surveys, 37(1), 42-81. https://doi.org/10.1145/1057977.1057980